The product was good and just what I needed, however I had moderate difficulty with the down load because the sight would not recognize my pass word. I was finally given a direct link to the manual and that worked.
Very quick and easy website to use and fast download of manual, quality of manual is excellent and will be pleased to use this service again in the future, thanks so much!
The Service Manual for Sansui AU-9500 was very helpfull, in complete and in good printable condition.
Thanks.
Text excerpt from page 19 (click to view)
SJ-48J-S/BE/BL SJ-51J-S SJ-55J-S
(3) Wiring of Lead Wire
L-band C
B
B
Defrost thermo. ass'y C
Alminum tape Fuse ass'y L-band C
A
A Detail
Lead wire�WHITE�
B Detail
Bend this pin
c Detail
Fasten Defrost thermo. ass'y's wires as bellow. And set it inside of the four pins.
7mm
Cut off to 7mm or shorter
Fuse ass'y Alminum tape
Horizontally Thermo.sensing element side (Silver metal)
(4) Setting of Lead E.V cover ass'y and F-thermostat
Inside of ribs Through between ribs
10mm over
Set surely edges of these two ribs.
E.V cover
Lead E.V cover ass'y Under 5mm F-thermostat Color: RED Color: BROWN
(5) Wiring of Connector
(6) Fixing of E.V cover sealer C
A
321 654 987 View from A
1. Lead E.V cover ass'y 2. Lead E.V cover ass'y 3. Pink lead of Defrost thermo. ass'y 4. Blue lead of Defrost thermo. ass'y 5. Lead E.V cover ass'y 6. Lead E.V cover ass'y 7. Black lead of Fuse ass'y 8. White lead of Fuse ass'y 9. No connect