|
Who's Online
There currently are 5953 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
OK?..manual is complet and helpfull... for repairing such a old and rare boombox like JVC PCM it is necessary...
;
Super Anleitung. Ordentliche Auflösung. Das ganze noch in Deutsch wäre zu schön. Alle Datenblätter sind sauber Kopiert und alle Leitungswege sind sauber ausgeführt
;
Thanks God for the internet and thanks for the service like this - proffessional solution on time.
;
About the service it's very fast and reliable. About the manual the quality is high enough to read even the tiniest details on the wiring diagrams so you can't ask much more than that, let it alone for a manual of a product from 20 years ago. Thank you, very satisfied.
;
The downloaded quality was as good as the orignial
VL-E990E 4-4-4. Adjusting the Tu guide
After replacement of Tu guide preset and adjust the height. (1) Tu guide height presetting (Figure 6) Adjust the height from the upper surface of mechanism chassis to the upper surface of lower flange with the aid of jig.
Lower flange Upper flange
VL-E990E
Height setting jig Master plane (JiGMP-MX7U)
Figure 6 (2) Adjusting the Tu guide (Figure 7) 1 Playback the alignment tape (VR2DBOPS). 2 Check that the tape runs at the same height near the capstan shaft in case of V/S F and V/S R. 3 If the tape running position in case of V/S R is higher than the tape running position in case of V/S F, turn clockwise the Tu guide nat. If the tape running position in case of V/S R is lower than the running position in case of V/S F, turn counterclockwise the Tu guide nat.
Capstan shaft Nat
Pinch roller
4-4-5. Checking the V/S F and R waveforms (Figure 8)
(1) Playback alignment tape (VR2DBOPS), and set the V/S R mode. At this time ascertain that the waveform crest pitch is kept constant for more than 5 seconds. (2) Set the V/S F mode. At this time ascertain that the waveform crest pitch is kept constant for more than 5 seconds. Unless the constant pitch is obtained, execute the checks of Section 4-2, 3, and 4.
Figure 7
a b c d
abcd
Figure 8
4-4-6. Checking after adjustment
(1) Envelope check 1 Playback the alignment tape (VR2DBOPS). 2 Ascertain that the envelope maximum to minimum ratio is 65% or more. (Figure 9) 3 Ascertain that the waveform does not change remarkably. (Figure 10)
C E MIN E MAX A C
Figure 9 (2) Rise check
E MIN E MAX
65 (%)
Figure 10
C 1/8A
1 Playback the alignment tape (VR2DBOPS). 2 Once eject the cassette, and then load it again. 3 Set the playback mode, and ascertain that the RF waveform rises horizontally within 2 seconds. At this time ascertain that there is no tape slackness near the pinch roller.
Capstan shaft Tu guide
Tu GR Tape slackness
4 After V/S F, R and FF/REW execute playback, and ascertain that the RF waveform rises horizontally within 2 seconds. At this time ascertain that there is no tape slackness near the pinch roller. (3) Checking the tape travel 1 When the tape is played back, ascertain that tape lift and tape curl of 0.3 mm or more do not occur at the lower flange of Si roller, upper flange of Sup GR, upper flange of Tu GR, and upper/lower flange of Tu guide. 2 In case of V/S F and R ascertain that no curl is found at each flange.
Tension pole
Figure 11
Sup tilted pole
Si roller
Sup GR
Drum
Tu GR
Drum Tu tilted pole
Pinch roller Tu guide
Figure 12
4-6
|
|
|
> |
|