|
Who's Online
There currently are 5881 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Doubted for buy this manual as it is my first order here and at not have cover image, I assumed would haven't. However, within 24 hs, already possessed the link to download it. The manual are scanned correctly and have all what is needed. Includes adjustments and diagrams of all circuits. Very satisfied.
;
Really good quality, аll readable.! Wonderful work shop. I recommend to all!
;
Good quality service manual.The scheme is on A3 format and very readable.Thank you
;
Very good service-manual with clear electrical diagrams. Thanks you.
;
the manual is in quite good quality and it's in pdf. manual was send in less then 6h.
VL-PD5S/E
8-3. How to operate with the circuit board without the cassette controller assembly.
In this method, if the procedure is followed incorrectly there is danger of damaging the mechanism and the tape, so except in special cases, such as when measuring the VSR torque, do not perform this procedure. Normally operate this unit with the cassette controller assembly attached. Be sure to follow each caution mentioned. (1) Apply DC3V to the loading motor to set the EJECT mode. (2) Remove the down switch angle. 1) In Fig. 5 remove the screws P and Q . Note) The loading motor solder joint (part T, Fig. 5) of DEW sensor FPC applied to the down switch angle is not removed. After the down switch angle is removed, take care so that the DEW sensor FPC is not broken. (3) Surely secure the moving piece R of down switch as shown in Fig. 6 with the aid of adhesive tape so that the switch is turned on. (4) Install the down switch angle. Note) To set the REC mode, press the pin of recognition switch S (not required in other modes). (5) Set the test mode (T-01) with the adjustment remote controller without loading the tape. Thereby the mechanism operation is enabled with the mode key. (6) To eject, remove the tape (3).
T
P
Q
S
8-4. Phase matching
For the parts listed below, match the phases as shown in Fig. 7. (1) AHC cam (2) MODE switch (3) Main cam (4) Sub cam Note) Before disassembling, check the marker positions carefully. Note) When installing the engagement gear, make sure that the main cam and sub cam phase matching hole aligns with the chassis hole. Note) After phase matching, turn the MODE switch by hand and confirm that it turns almost one complete turn. (After checking, return it to its original position.)
Fig. 5. STANDBY mode
R Down switch moving piece
R Down switch moving piece Down switch angle
Adhesive tape Adhesive tape
AHC cam Phase matching hole (for chassis) Phase matching mark
Fig. 6
MODE switch
Phase matching mark
Main cam
Coupling gear
Sub cam Phase matching hole (for chassis)
Phase matching hole (for chassis)
Fig. 7
15
$4.99 VL-PD5E SHARP Parts Catalog Parts Catalog only. It's available in PDF format. Useful, if Your equipment is broken and You need t…
|
|
|
> |
|